The End of an Era…

May 2, 2019

The sock is still in the works. And now it’s taken to falling off the needles at almost regular intervals. I think I need better needles, or some school-age complaining terms.

In the meantime, it’s a bittersweet day. I just attended my last final exam, in which the coursework was all turned in last week, and I did my reading last week. So, I was attending mostly for the food and to hear a few people read their own work. It’s also a requirement of the class.

DSCN4759

Back of the sock…

This was for poetry class. We’re a bit sentimental as it is. Some of our students were published in Third Wednesday this year, too; which was very exciting for them.  However, my instructor recalled one of my more belabored poems which nearly opened me up and laid me bare. And he mentioned how graduation is a special moment, and it all hits you at once.

DSCN4760

Front of the sock…

I get it. It started earlier this week, as it has all been bittersweet. But today, it reared its head even more, and every little thing left me wanting to cry. This degree is twenty-five years in the making, essentially, rather than a standard four, five, or ten years. It is quite special to me. And my last moments was that of an instructor praising my work. This is part of what I hoped for in returning to school four (or five) years ago. It still leaves its own sense of loss that I cannot explain. I want to be excited about the future, but everything is up in the air.

DSCN4763

Front of the sock in the right shade of green…yes, these are the same sock.

I want to be glad I’m not, but I’m looking for ways back in through graduate school and possibly teaching others to do what I’ve done, or better. In the meantime, I may get a little more time for knitting or quilting…but I have to work and hope other things work out as well. Wish me luck and until next week,

Happy Knitting!

Advertisements

The Fountain’s Back…

April 25, 2019

and the balancing rocks which makes my day.  (Photo to come, it’s on my phone)

DSCN4744

See the lovely fountain;-)

This week’s progress has been slow, but semi steady. But my bright moment of the day involved two of them. I took pictures at the fountain, which wasn’t flowing last time I checked. It was running today and lovely and peaceful. The second was a surprise encounter with a classmate I’ve grown to like and respect over the course of the semester. I ran into Rob while taking the following photos.

DSCN4742

Here is the challenging front of the sock…

I ran into semi-snafu’s with the knitting this week, but I fudged it and later, maybe you’ll see the angel’s kiss. Though, I admit, I think the front of the sock has more angel kisses than the back. I knit the front pattern row first, so I’ve figured out what I’ve misread or when I was distracted while I’m knitting the back pattern row.

DSCN4743

…and the back of the leg which may make you love to watch me leave…

These socks may look better going than coming…Alas, I’m going to love them all the more when they are done. The more challenging prospects are often the most satisfying.

Until next time,

Happy Knitting

A Little At a Time…

April 4, 2019

I’ve gotten a few more rows done this week, and part of me cannot wait until school is out to finish this sock and it’s mate. I did revisit some socks I finished last semester. I still need to weave in ends and tie off holes. Shh…I’ll get to them…just not on this gentle Thursday. I did inspect them again and try them on my feet. The heels fit funny. I may have to re-knit my stealth argyles…I may sew them as blister protector cushions. Who knows.

DSCN4704

Back view…shh…I’m fixing the ladders.

In the meantime, I did get a little knitting done as I waited for events and class to start this week, and on break while substitute teaching. Yeah. I did have to judge if I had time to start the next row. I didn’t. I ended up starting that next row while waiting for a fun poetry reading. The poet had done well at Slam Poetry previously. Her performance style showed. It was a good reading, and here’s my current progress.

DSCN4703

Front view of this complicated sock. It’s a fun knit, but it requires concentration.

I might be doing vanilla socks for my next pair.

A Little at a Time

March 28, 2019

Every day or night this week has had something extra thrown in…quilt guild, readings and a play, job interview/hiring process and creating more questions than I go along…not to mention assignments. This means there is not as much time for knitting as I would like, and yet, sometimes there’s a little here and a little there. So, I still got a little bit knit during the play–only a little as I have to write about said play; while I took a deep breath waiting for class to start and sometimes at home after an event to finish off a row.

DSCN4687

Current Progress on the Toe-Up Travelers by Ann Budd.

I will say, one thing about knitting over four needles is that it is easy to get to a stopping point when I’m interrupted, as long as I note where I was and which needle I was knitting when I stopped. It is pretty obvious and I try to stop in the middle. Alas, my current progress above as I watch Project Runway and submit tonight’s homework.

DSCN4688

Scamp inspecting the Toe-Up Travelers by Ann Budd.

Until next time,

Happy Knitting!

Over the Heel…

March 24, 2019

 

011Over the heel and through the leg…

I finally knit the heel. Then I thought, try on that sock. I’m glad I did, the first heel I knit (since this type of short row heel was confusing for me) was two inches too long! I did a lot of frogging with that discovery, and re-knit the heel as best I could. This one fits. Yeah. I’m now into the leg, which I thought would be more of a bear.

013

Bring the pattern around the back…

The leg is laid out on four needles, and I have to tug those second and third stitches often to prevent ladders, but I think the layout makes more sense than the top of the foot knitting did. It’s at least easier to follow, for me. Until next time,

012

This needle layout makes sense to me! It’s becoming fun again. 

The knitting is still complicated, but fun. The pattern is Toe-Up Travelers by Ann Budd and can be found on ravelry.com or in Sock Knitting: Master Class.

Happy Knitting!

 

Almost Spring Break…

February 28, 2019

Yes, Finally. It is almost spring break, so one would think I’d be doing homework instead of knitting. But we all need breaks…and I still get to class early to knit sometimes.

DSCN4582

Almost ready for the heel, then comes the semi-scary leg.

I am halfway through the third repeat on the sock. I need to set aside time each day to make progress when I’m more awake. Deadlines were yesterday or today, with the exception of one mid-term that I’m likely tackling in the morning.

DSCN4581

Bottom of the foot…if you can’t see it, I’m not telling.

I set some goals for Spring Break and we’ll see how many of them I hit. Tonight, I’m simply doing mindless knitting. I’m even showing progress so I can see how this thing grows in increments.

DSCN4578

Shawl progress…the latest in mindless knitting.

Until next time, Happy Knitting!

Three Skeins in, seven to go…onward to the fourth.

I have finally knit through the third skein of yarn. I had to count the remaining hanks of yarn to be certain. It’s simple, I can watch my favorite tv shows while I knit this. It’s also growing. I should measure it tonight to track how far I’ll go with hanks four and five. I have ten skeins of yarn to use in this. I’m debating about stopping after four and decreasing with four more skeins and making something matching or some border details in this, but I haven’t decided where exactly I might go with this.

DSCN4504

Can you believe it? I’ll try to get a spread photo on my sewing table over the weekend…I’ve got a wing;-).

I’ve also knit through the second repeat of the first sock and have moved onto the third. I should be able to knit the heel over spring break if I’m good. However, I have a fair amount of school work to do, and I may be seeking further gainful employment. It has been a challenge, but I should be more gainfully employed next week. Fingers crossed. But you guys would rather see the sock, right?

 

DSCN4502

Progress on the sock, Two repeats of the chart down…one more to get to the heel.

Enjoy your gratuitous knitting photos. I hope yours goes as well or better (one day, I’ll learn not to knit when tired, but that explanation may be for next week). Until next time, Happy Knitting!

Compliments and Curiosities

January 31, 2019

Explains my last week. This week, nothing got done as everything was closed. So, I caught up on homework, Graduate School Applications, small personal matters, and quilting.

However, last week, when I got busier than busy (as everyone thinks I have a spare hour, really), I found two things happening.

Let’s revisit Tuesday first. I took my shawl to quilt guild. It’s simple knitting, and the weather was only bad, not horrible. So I got to chat with Jan, who was presenting and had a great trunk show. But others noticed my “mindless” knitting. The knitting is mindless in that I can knit while chatting with others.

dscn4445

So, this is what ‘even stitching’ looks like. I never gave it a thought…in fact, I wish I’d followed the pattern more closely.

One of my fellow quilters (and likely knitters)  commented on my even stitching. (I never gave it any thought, it is pretty even, isn’t it?). Alas, that’s just the shawl, in which I admit I have no idea what I’m doing.

Also, Thursday of last week, I was waiting for an appointment, and took my socks. I was working on them when an 8-10 year old boy asked about them. I think he’d been grounded from his phone and he forgot a book or toy. His buddy wasn’t there yet, so my complicated socks happened to be the most interesting thing in the room. I was happy to explain the stitches as I waited for my own appointment.

dscn4447

The latest on the complicated socks…we’ll see what happens between now and next week (hopefully).

Here’s the progress, so far. (Classes have been mostly cancelled this week, so knitting has been light, but here’s the current progress).

Or perhaps half of the fun is accomplishment…And don’t ask me tonight about changing the pattern. I think the fatigue of a bug has left me addle-pated. Read on to find out what I mean…I hope. 010

Almost finished…one more row…then the next set…Toe Up Travelers by Ann Budd

 

I enjoy every moment knitting and snuck some in time class knitting this week on a particularly complicated row. To be honest, I started the row just before class and didn’t finish it before class started. So, in the midst of taking notes, I had a complicated row of cabling and knitting through the back loop six times. Half of the fun is getting there, which I’m working on now.

012

Forgive the shadow…What would this sock look like if I inverted the pattern?

The other half of the fun is the sense of accomplishment from getting there. I got within one row of finishing the repeat this afternoon. However, class was cancelled and I felt simply worn out. I came home and decided to try to nap. Not only did I find I could sleep, I found myself going hot/cold. I really don’t like getting sick. So I took most of the night off, and slept, and sewed and worked on a little homework.

 

However, serious concentration is out the window, so that last row is debatable if I should get to it or not. Part of me says I could do it, part of me says read a book and go to bed. Okay, okay; you talked me into it. Mostly, because if I let it wait, I won’t get to take the photo I want. Instead, I just went ahead and knit up that last row, and voila! I’m one-third of the way done with the foot.

 

However, as I look at this pattern, I want to knit the second part of this round upside-down and turn this repeated triangle of meandering twisted stitches into a diamond…This could get interesting to see…Stay tuned, folks. 

New Cast-Ons…

December 20, 2018

Who doesn’t love a new cast on?

The beginning of my new shawl…with Briannag’s help for modeling. (If I let her wear it, she might decide it is hers.

I needed something new after the post classes slump and having time on my hands (in which I should put down the needles and clean at some point, but that’s not why we are here). I did two cast-ons. I frogged the 216 stitch sweater vest with various sets of stitches throughout and opted for a simpler shawl. I’ve based mine off of a couple of free patterns and am hoping for the best, but I’m just knitting as I go along increasing on the same side of either row. Currently, this is my television and chatting with others knitting.

Beginning pattern work on the new sock

I also cast on a “Twisted Stitch” sock. This sock is in Ann Budd’s Sock Knitting: Master Class. It’s lovely, but this one will likely only be knit at home. This chart is pretty intense and requires concentration. It won’t be easily memorized for some time. But check these out…Now I must find some comedy or a good podcast (because the television went out last night at the height of Christmas movie season and we won’t have it playing shows or movies until Sunday, likely).

DSCN4296

Beginning of the toe, when things begin to straighten out

Until next time, Happy Knitting!