The Fountain’s Back…

April 25, 2019

and the balancing rocks which makes my day.  (Photo to come, it’s on my phone)

DSCN4744

See the lovely fountain;-)

This week’s progress has been slow, but semi steady. But my bright moment of the day involved two of them. I took pictures at the fountain, which wasn’t flowing last time I checked. It was running today and lovely and peaceful. The second was a surprise encounter with a classmate I’ve grown to like and respect over the course of the semester. I ran into Rob while taking the following photos.

DSCN4742

Here is the challenging front of the sock…

I ran into semi-snafu’s with the knitting this week, but I fudged it and later, maybe you’ll see the angel’s kiss. Though, I admit, I think the front of the sock has more angel kisses than the back. I knit the front pattern row first, so I’ve figured out what I’ve misread or when I was distracted while I’m knitting the back pattern row.

DSCN4743

…and the back of the leg which may make you love to watch me leave…

These socks may look better going than coming…Alas, I’m going to love them all the more when they are done. The more challenging prospects are often the most satisfying.

Until next time,

Happy Knitting

Advertisements

Procrastiknitting…

April 11, 2019

Has two meanings…writing poetry when you might be knitting is one of them.Avoiding knitting mistakes, so you don’t have to work out cabling errors is another. I may have fallen into both categories this week. So, I began knitting to avoid necessary homework…I should know better. I don’t. I’m not sure any of us really know better, even when we should.

DSCN4714 - Copy

Scamp, showing off latest repair effort

I missed a purl stitch in the pattern…so I began procrastinating the fix. However, I finally took time to fix it. Tomorrow’s break knitting in Middle School (Spanish and Art), should be fun, provided it’s not first or second hour and they ask me to work for someone else. However, I’m now smart enough to say extra work. (Yes, partly because it’s hard to say, “No.”). In the meantime, this row is fixed and finished while watch Project Runway re-runs (and I thought Project Runway was over).

DSCN4717

Tink showing off the latest cable knitting

Alas, I have to read for classes and catch another play–the hardship! I want to know how it ends, which is a good sign for A Raisin in the Sun, partly because I may know how Macbeth ends already (even if I don’t remember it–part of me doesn’t care). In the meantime, here’s the procrasti-knitting.DSCN4717

Tink, helping me show off my knitting.

Until next time,

Happy Knitting!

 

A Little At a Time…

April 4, 2019

I’ve gotten a few more rows done this week, and part of me cannot wait until school is out to finish this sock and it’s mate. I did revisit some socks I finished last semester. I still need to weave in ends and tie off holes. Shh…I’ll get to them…just not on this gentle Thursday. I did inspect them again and try them on my feet. The heels fit funny. I may have to re-knit my stealth argyles…I may sew them as blister protector cushions. Who knows.

DSCN4704

Back view…shh…I’m fixing the ladders.

In the meantime, I did get a little knitting done as I waited for events and class to start this week, and on break while substitute teaching. Yeah. I did have to judge if I had time to start the next row. I didn’t. I ended up starting that next row while waiting for a fun poetry reading. The poet had done well at Slam Poetry previously. Her performance style showed. It was a good reading, and here’s my current progress.

DSCN4703

Front view of this complicated sock. It’s a fun knit, but it requires concentration.

I might be doing vanilla socks for my next pair.