Another Round? Why Not?

November 30, 2017

On me…pull up a chair and pour another glass…and keep the yarn on the needles. I thought I was getting close to beginning the heel. I don’t know what I missed or when, but I should be at the heel…I’m not. The pictures even suggest it, but the sock measuring says “Are you kidding me? Keep knitting!” Apparently, these will be December 24th socks…knitting right up until Santa comes…or whenever the visiting the recipient’s deadline arrives.

DSCN2899

It looks so close…but it isn’t…

I knit my tush off this afternoon, after actually working on some homework. I knit my tush off on Thanksgiving last week. I knit again and again, even as I waited for a second poster for my capstone project presentation(I’m not done yet, I just took the capstone class a bit early). I thought I was approaching the heel today as I knit…and I am…but not for seven or eight more rounds…

DSCN2901

At least seven more rows…alas…I’d better get back to it…

In the meantime, there’s only one thing to do…(or two or three…). It’s a knitting blog: perhaps the only thing to do is knit. But I also have to edit poetry, memorize a poem, and have a capstone paper to write. At least it’s not all due tomorrow. However, if I don’t prioritize and get something done each night…I’ll be working towards another meltdown this semester. I’d better get back to editing poetry…and see what my poster presentation pulls off on Tuesday in order to add to my paper.

 

Advertisements

Thanksgiving Week

November 23, 2017

It’s Thanksgiving on Thursday this week. This means a short class week for me, but a normal work week. We gather with friends and family and eat too much of everything. There will be knitting as well. I cast on a Twisted Yarn Christmas tree just to have mindless knitting throughout the day. I will also need to pick out a poem to memorize soon, and may merge it with another I’m supposed to be memorizing and creating a presentation about.

DSCN2894

I’ve made some progress on the socks…probably more than I think…but it feels like very little this week. It’s been a busy week of more forgetfulness and sometimes of rather important events. If it’s not part of my routine this week, it just wasn’t happening, unless it replaces something I’d forgotten last week.

DSCN2888

I hope the tips I’m getting for this help. I still need to knit and quilt, but both have been slowing down as the homework stack grows. When can I get back to serious knitting…I want these ol’ socks over the heel by the time I get to break so I can knock them out and focus on the hat i haven’t touched this past two weeks. I may work in some time for that Sunday afternoon. In the meantime, if you celebrate Thanksgiving, I hope it was more than you thought it would be, and in a good way. If you don’t, Happy Knitting until your next festivities;-).

DSCN2892

Dropping the Ball…

November 17, 2017

…not the yarn…thankfully…

…not literally, thankfully, as this yarn would likely roll everywhere…But it’s been a heck of a week, missed important appointments, meltdowns over assignments…work for assignments always feels off or late…but has been somehow good enough to get me by. I’m appreciative of my instructor’s flexibility at this point.

However, the knitting continues…although with my crazy week, I got nothing done on the hat and will need to return to it one day…maybe. In the meantime, I’m still finding time to knit between classes, when I’m not memorizing poems for performances…I became a fluid tree for about two seconds today…but none of the trees I represented were truly fluid…though they dance in the winds of a pale sea-green breeze. There are no pictures of this performance, and I’m okay with that…

DSCN2835

Scamp, inspecting my knitting bag for goodies to run off with…

Okay, okay, I performed “For C.W.B.” by Elizabeth Bishop.  There are tree lines, and statements of beginning a life together and mention of a stork. I ensured it was presented rather sensually. Only one person thought it was too much…the instructor did not. In fact, when the tree branches swayed in that pale sea-green breeze I saw their smile…which just encouraged me.

DSCN2866

Backside of current sock with first sock for comparison….I was getting more color play on the second sock for a bit…

Now, let me get back to the knitting. There was some…I mentioned on a sock knitting facebook post that I just about had my pattern memorized, but still carried it with me just in case. So, I looked at my pattern and said, “Oh, I’m knitting row 12, it goes like this…” and proceeded to knit it half wrong. I simply worked my bridge stitch early. It is supposed to be in row 13.  Previously, I think I worked it late…so now I have slightly wonky bridge stitches…see if you can find them.

DSCN2865

Front side of the second socks…with back side for comparison…enjoy… 

Yes, I know the stripes are off..I’m going with it. Sometimes, socks get to be wonky. I hope you enjoy them…as well as the recipient, so I’d better get back to knitting. I will say, to some extent, I can knit and rehearse lines if I do so carefully, but then I will end up with socks that veer off course more than I do.

Simple, but effective…

November 10, 2017

DSCN2844

Sock progress this week…it’s been considerable…

It’s been quite a week, and I’m skipping the details, as they’re not mine to tell. I’m not sure how much I got done on the hat this week, but I think there may have been progress. However, the proud moments involve the sock. I’ve been taking it to classes and for studies…and a musical. Spring Awakening is quite a musical…my favorite moment involved a fellow theater-goer. We got to a risque scene in the play and the lights abruptly go on for what I recognize as intermission…and the young man next to me says, “What?!” I looked at him and assured him, “There’s more.”

DSCN2834

Scamp thinks this is her knitting bag…or there are treasures in here she can run off with…I caught her in time…

In the meantime, I need to get back to knitting, quilting and schoolwork…ugh…If you want to know what a psychological study looks like, send me a message. Otherwise, I need to get to bed, and compile data and…never mind…my brain needs a rest. Enjoy my baby kitten(not so much anymore) Scamp, trying to claim the knitting bag…I think she wants to learn to knit.

Knitting While Scheduling…

November 3, 2017

…in my world almost means less time for knitting. Unless you schedule that in too. How do I explain? Two weeks ago, my instructor said, “You seem stressed. Why don’t your turn your study into an online study?” I said, “I’ve already prepared for the traditional method.” Him: “Look into making it an online study.” I felt my stress(which was high,) go through the roof. I didn’t know how to tell him changing this in the middle of class was not a good idea. I tried, I really tried. He wasn’t having it. So, I went on one of those newfangled survey websites and set up an online survey. I put it in the system…I went live…and nothing. No data, though I had a subject. Maybe it takes time I thought? So I looked into it…How long should it take? Finally, I contacted said participant through email. She couldn’t get to the survey.

DSCN2820

Current progress on the Grayfields hat…part of me cannot wait to see how it knits up.

I contacted the instructor, who thought I should visit him in class (while I still believed things were going well and I was collecting data, like he told us to do). Long story short…study was reverted to traditional method, and now I’m playing the timeslots/book a room game. The rooms get booked for an hour or two at a time. The students show up for a ten to twenty minute experiment…a simple one…no real cruelty here, promise…except the frightful weather they sometimes have to traipse across campus through. Scheduling fun…and I can only carry so many books. So, what’s lightweight and simple to carry: Knitting! Can you believe it? .All that to tell you I was knitting before my study tonight…but the second sock is cast on and the first two rows are knit.

DSCN2823

Second sock cast on…we up and running…these are probably a Christmas gift…

I’m calling that progress…because I also made progress on the winter Gray Fields hat …at least I think I have…If you know any Russian knitters, send them my way (via internet, of course). Otherwise, I’m continuing with this pattern as I interpret it. But I have made pretty good progress on the hat as well…the pattern rows cover 126 stitches, feel like they take forever and are complicated…but the knit rows work up pretty quickly…after I note my progress…it’s almost like knitting two socks at once, but that was 144 stitches….I’m going to need an attention grabber if ever I attempt an afghan or a shawl…or some tricks….In the meantime…feast your eyes on these and hope my scheduling goes better this week.